Metal Alloy Stainless Steel Investment Casting

Metal Alloy Stainless Steel Investment Casting

We supply die casting, sand casting,lost wax investment casting, etc.
Chat Now

Product Details

Metal Alloy Stainless Steel Investment Casting Lost Wax Cast Hardware Part


Our casting advantages

1.Developing engineering and customed products as required.

2.Chifine own R&D center could make the clients' ideas to be actual products with support from related engineers from different fields.

3.Experienced technical and inspection team.

4.The whole production cycle is monitored by our Quality Management System 

5.Very strict with quality control and delivery time.

6.Regular production report.


Our Service

1, various kinds of die casting, lost wax casting auto parts for choice

2, well packed

3, Guaranteed product quality

4, Satisfactory product price

5, prompt delivery time

6, excellent customer service


PROCESS

Drawing→ Mold → Die casting → Deburring → Drilling holes → Tapping → CNC Machining → CNC control center → Polishing → Surface Finishing → Assembly → Quality Inspection → Packing



Basic Info

material
stainless steel, carbon steel, steel alloy, ductile iron and so on   
Productive Process
Wax Mould-Shell Making-Dewaxing-Smelting&Casting-Shell Off-Blasting-Cutting&Polishing-Acid Washing-CNC Precised Machining
 
Casting facility
wax injector, electric furnace,heat treatment furnace,cutting head machine, shot-blasting machine, sand-blasting machine
 
Machining facility
CNC,NC lathe,ordinary machine tools,linear cutting machine, NC milling machine, polishing machine
 
Heat treatment
Normalizing/Quenching/Tempering
 
surface treatment
machining, Polishing(brushing, mirror polishing)
 
Test facility
spectrometer, tensile test machine,impact tester, hardness test machine,CMM,PT
 
Delivery time
sample 25 days, mass production 30-40 days
 

FAQ:

1. How many days it will take to develop one new item?
It will take about 20days to make molds and make samples for your checking.

2. What is your common delivery time for a bulk production?
Commonly 20-30days after prepayment paid

3. If we do not have related drawings, could you make drawing for us?
Yes, we can. Only you offer us detail information about your samples, our engineer can make correct drawings for you. 


Our Company

image



Inquiry